Site start

Building extension site start — Dalkey

Dalkey, Dublin

1 commencement notice · start date 15 Aug 2014 · planning reference given

Planning D13B/0298 · Planning application

View full project timeline

Commencement notices
1
Latest start date
15 Aug 2014
Latest notice
1 unit
Planning reference
D13B/0298
Location
Dalkey, Dublin

Location

Where the site is

Area
Dalkey, Dublin
County
Dublin

Addresses on the notices

  • attic level to the rear

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

1. Demolition of single storey extension to the side of the existing semi-detached two-storey property. 2. Construction of a two storey pitched roof extension to the side of existing with high level 'Velux' style roof lights at attic level to the rear. 3. Construction of single storey pitched roof extension to the front, side and rear of the existing property. 4. Elevational alterations to the side and rear of new of the existing property. 5. New 'Velux' style roof lights in the existing extensions. 6. Landscaping and associated site works including widening of existing vehicular entrance and new pedestrian entrance.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference D13B/0298

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.