Site start
Housing site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 30 Jun 2025 · planning reference given
Planning D22A/1018 · Planning application
- Commencement notices
- 1
- Latest start date
- 30 Jun 2025
- Latest notice
- 1 house
- Planning reference
- D22A/1018
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of single storey flat roofed extension and double height flat roofed extension to the side and front of the existing dwelling house including adjacent new bicycle store, energy retrofit external wall and roof finishes incorporating new windows. Construction of infill rear garden single storey storage shed. Proposed removal of existing vehicular entrance from southwest corner of site away from acute bend in road and reinstatement of boundary wall and hedgerow. Formation of new vehicular entrance to north west corner of the site incorporating new piers and local dishing of pavement
Floor area stated for this source: 150 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.