Site start
Site start — Dublin
Dublin 1, Dublin
3 commencement notices · latest start date 10 Jul 2024 · planning references given
Planning 3245/20, 4202/21
- Commencement notices
- 3
- Latest start date
- 10 Jul 2024
- Latest notice
- 14,000 m²
- Planning references
- 3245/20 · 4202/21
- Location
- Dublin 1, Dublin
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Fit out of the shell and core offices on ground floor up to 7th Floor . The basement is not being altered as part of the proposed works and is not a part of this application.
Floor area stated for this source: 14,000 m².
Alterations to existing building limited to the completion of shell and core works with all ancillary works and access included with interim provisions as necessary to access floor plates for the fitout works including temporary ramps.
Floor area stated for this source: 15,844 m².
Demolitions and enabling works at 25-28 North Wall Quay, Dublin 1
Floor area stated for this source: 9,290 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.