Commencement notice group

Housing commencement notices — Galway

Galway, Galway

1 separate notice · latest notified commencement 31 Jul 2025 · planning reference supplied

Source notices
1
Latest notified commencement
31 Jul 2025
Latest notice
446 m²
Planning references supplied
ABP-317441-23
Public location
Galway, Galway

Public source geography

Site location

Public site / locality
Galway, Galway
County
Galway

Public site labels seen across the notices

  • No
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Appeal referenceABP-317441-23

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0131132GY BCMS owner-supplied export

(a) change of use to student accommodation and extension of previously granted detached house (merged of semi- detached houses) to form a 13 bedroom student accommodation (all ground floor bedrooms wheelchair accessible) in a single 2 storey building (b) demolition of rear house extensions and existing shed (c) construction of a new rear part single and part two storey rear extension and small front single storey entrance extension (d) all associated elevation changes (e) construction of a bin store and covered bike stand (f) construction of rear single storey self- contained recreation room for the sole use of the main building occupants (g) all associated building works and all associated site works at No. 7 and No. 9 Upper Newcastle Rd, Galway.

446 m² · stated on this notice

Appeal reference ABP-317441-23 Builder stated: Ely House Works Ltd Developer stated: Berls Developments Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.