Housing commencement notices — Killarney
Killarney, Kerry
4 unique commencement events · latest notified commencement 22 Apr 2024 · planning reference supplied
- Unique commencement events
- 4
- Latest notified commencement
- 22 Apr 2024
- Latest notice
- 418 m²
- Planning references supplied
- 23/967
- Public location
- Killarney, Kerry
Major-project dossier · Wave 2 · W2-032 · Batch 2
Reviewed planning, commencement and document evidence
Exact project story for 23967 under Kerry County Council, retaining 4 separate commencement identities.
Source-backed scopeHousing commencement notices — Killarney
Planning permission scale, commencement-event scale and official document titles remain separate; no notice totals are summed.
- Commencement identities
- 4 retained separately
- Latest group date
- 2024-04-22 not assigned across events
- Maximum on one notice
- 8 units never summed
- Reviewed index
- 136 8 exact document links
- Permitted scale
- 249 units permission record; not summed with notices
Planning and appeal references
- Planning_Application 23967 Open exact official record
- Appeal 318509 Open exact official record
Supplier screening cues
- Residential or built-area scale screening cuePermitted scale record states 249 residential units and 21,222 m² floor area.
- Phased-delivery screening cueOfficial file index includes “17.04.26 Phase 5A Engineer's Letter of Compliance”.
- Architectural-package screening cueOfficial file index includes “16.06.2025 KPH Letter : Drawings & Documentation”.
- Civil, drainage and SuDS screening cueOfficial file index includes “12.03.2025. UE Foul Sewer Inspection CWK-01-03.”.
- Landscape, play and ecology screening cueOfficial file index includes “ECOLOGICAL IMPACT ASSESSMENT”.
- Roads, access and lighting screening cueOfficial file index includes “Aug. 2023. Stage 1. Road Safety Audit. MHL Ltd.”.
Every retained commencement event
- 2024-04-22 SN0010081KY 4 units on this event · 293 m² on this event Open official commencement source
- 2024-04-22 SN0010083KY 8 units on this event · 592 m² on this event Open official commencement source
- 2024-04-22 SN0010191KY 6 units on this event · 463 m² on this event Open official commencement source
- 2024-04-22 SN0010198KY 418 m² on this event Open official commencement source
Exact organisation roles
- Kerry County CouncilPlanningauthority · Exact official planning record 23967.
- An Coimisiún PleanálaAppealauthority · One or more exact official appeal references are retained.
Explicit facts with official citations
Each statement keeps its exact reference, official title or drawing-title locator, and review state.
- Planningoutcome Planning outcome recorded as CONDITIONAL. 23967 · Official planning record — 23967 · Decision field · exactauthorityreferencerecord Open official evidence
- Permittedscale Permitted scale record states 249 residential units and 21,222 m² floor area. 23967 · Official planning record — 23967 · Residential units and floor-area fields · exactauthorityreferencerecord Open official evidence
- Sitelayout Official file index includes “CWK-01-02 Rev B Site Layout Plan, PROPOSED TIC Map”. 23967 · CWK-01-02 Rev B Site Layout Plan, PROPOSED TIC Map · CWK-01-02 Rev B Site Layout Plan, PROPOSED TIC Map · listedonexactofficialfile Open official evidence
- Phasing Official file index includes “17.04.26 Phase 5A Engineer's Letter of Compliance”. 23967 · 17.04.26 Phase 5A Engineer's Letter of Compliance · 17.04.26 Phase 5A Engineer's Letter of Compliance · listedonexactofficialfile Open official evidence
- Architecture Official file index includes “16.06.2025 KPH Letter : Drawings & Documentation”. 23967 · 16.06.2025 KPH Letter : Drawings & Documentation · 16.06.2025 KPH Letter : Drawings & Documentation · listedonexactofficialfile Open official evidence
- Engineeringanddrainage Official file index includes “12.03.2025. UE Foul Sewer Inspection CWK-01-03.”. 23967 · 12.03.2025. UE Foul Sewer Inspection CWK-01-03. · 12.03.2025. UE Foul Sewer Inspection CWK-01-03. · listedonexactofficialfile Open official evidence
- Landscapeplayecology Official file index includes “ECOLOGICAL IMPACT ASSESSMENT”. 23967 · ECOLOGICAL IMPACT ASSESSMENT · ECOLOGICAL IMPACT ASSESSMENT · listedonexactofficialfile Open official evidence
- Decisionorder Official file index includes “Appeal Decision”. 23967 · Appeal Decision · Appeal Decision · listedonexactofficialfile Open official evidence
- Roadsaccesslighting Official file index includes “Aug. 2023. Stage 1. Road Safety Audit. MHL Ltd.”. 23967 · Aug. 2023. Stage 1. Road Safety Audit. MHL Ltd. · Aug. 2023. Stage 1. Road Safety Audit. MHL Ltd. · listedonexactofficialfile Open official evidence
- Otherreport Official file index includes “12.05.2025 Completion Certs for Elec Installations”. 23967 · 12.05.2025 Completion Certs for Elec Installations · 12.05.2025 Completion Certs for Elec Installations · listedonexactofficialfile Open official evidence
- Otherdrawing Official file index includes “08.11.24 DKP-N95-2007 Combined Underground Service”. 23967 · 08.11.24 DKP-N95-2007 Combined Underground Service · 08.11.24 DKP-N95-2007 Combined Underground Service · listedonexactofficialfile Open official evidence
Official document index highlights
Official drawing, report and decision titles retained from an exact authority/reference inventory; the index is not asserted to reproduce the complete authority file.
- Site layout CWK-01-02 Rev B Site Layout Plan, PROPOSED TIC Map Open exact official record
- Site layout CWK-01-02 Site Layout Plan, Potential TIC 10.06.25 Open exact official record
- Site layout Site layout plan Open exact official document
- Site layout Site layout plan Open exact official record
- Site layout Site location map Open exact official document
- Phasing 17.04.26 Phase 5A Engineer's Letter of Compliance Open exact official record
- Phasing 18.08.2025 Phase 1C - Foul - Inspection Report Open exact official record
- Phasing 20.01.2026 Phase 5A - Foul - Inspection Report Open exact official record
- Phasing 20.01.2026 Phase 5A - Storm - Inspection Report Open exact official record
- Phasing 24.09.2025 Phase 4 - Foul - Inspection Report Open exact official record
- Phasing 24.09.2025 Phase 4 - Storm - Inspection Report Open exact official record
- Phasing 26.01.2026 Phase 4 Engineers Letter of Compliance Open exact official record
Showing 12 of 136 reviewed index entries.
Source limitations and event boundary
Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.
- The reviewed official index did not expose a classified inspector/planner report title.
- Organisation roles are limited to the exact planning authority and, where present, the appeal authority; no project-team or supplier role is inferred.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Killarney, Kerry
- County
- Kerry
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kerry County Council planning record Application details, status and decision record for 23/967. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a 2-storey Creche building. Building to be constructed from an ICF system.
Floor area stated for this source: 418 m².
Construction of 2 storey building consisting of 6 no. apartments. (2 no. 1-bed & 4 no. 2-bed) Building to be constructed in an ICF system. (Block G)
Floor area stated for this source: 463 m².
Construction of 2 storey building consisting of 8 no. Apartments (4 no. 1-bed & 4 no. 2-bed). Building to be constructed from an ICF system. (Block I)
Floor area stated for this source: 592 m².
Construction of 2 storey building consisting of 4 no. Apartments (2 no. 1-bed & 2 no. 2-bed). Building to be constructed from an ICF system. (Block H)
Floor area stated for this source: 293 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.