Commencement notice group

Housing commencement notices — Bray

Bray, Wicklow

1 separate notice · latest notified commencement 30 May 2016 · planning reference supplied

Source notices
1
Latest notified commencement
30 May 2016
Latest notice
2 units
Planning references supplied
15518
Public location
Bray, Wicklow

Public source geography

Site location

Public site / locality
Bray, Wicklow
County
Wicklow
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference15518

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0016651WW BCMS owner-supplied export

change of use of the first and second floor office space to 2 No. Apartments consisting of 1 No. 2 bed apartment and 1 No. 1 bed apartment with private open space to the rear of the property . Planning permission is also sought for the construction of a single storey extension measuring 18.77sqm to the rear of the existing ground floor shop and the provision of corridor from stairwell to rear garden space through shop area and includes landscaping, drainage and ancillary works

2 units · 19 m² · stated on this notice

Planning reference 15518

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.