Site start
Housing site start — Dublin
Dublin 6W, Dublin
1 commencement notice · start date 21 Apr 2025 · planning reference given
Planning 3518/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 21 Apr 2025
- Latest notice
- 60 m²
- Planning reference
- 3518/22
- Location
- Dublin 6W, Dublin
Location
Where the site is
- Area
- Dublin 6W, Dublin
- County
- Dublin
Addresses on the notices
- ground level and a mezzanine with storage above
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Planning permission consisting of alterations to the garage structure adjoining the laneway to the rear of site, raising the ridge height from its current level of 4.5m above ground level to a new height of 6m above ground level, accommodating a home office space at ground level and a mezzanine with storage above. Materials and finishes generally will match existing with the addition of a new zinc roof covering. A new window is to be provided at mezzanine level facing the public laneway.
Floor area stated for this source: 60 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.