Site start

Housing site start — Monkstown

Monkstown, Dublin

1 commencement notice · start date 23 Feb 2023 · planning reference given

Planning D19A/1009 - D23A/0329

Commencement notices
1
Latest start date
23 Feb 2023
Latest notice
216 m²
Planning reference
D19A/1009-D23A
Location
Monkstown, Dublin

Location

Where the site is

Area
Monkstown, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Demolition of the existing single storey boiler-house and wash-house at the side of the existing house and the construction of 2 semi-detached two storey dwellings in the side garden of the existing property and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 216 m².

Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.

Planning reference D19A/1009-D23A Developer stated: Sunny House Construction Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.