Site start

Housing site start — Malahide

Malahide, Dublin

1 commencement notice · start date 28 Feb 2023 · planning reference given

Planning F22A/0644 · Planning application

View full project timeline

Commencement notices
1
Latest start date
28 Feb 2023
Latest notice
10 units
Planning reference
F22A/0644
Location
Malahide, Dublin

Location

Where the site is

Area
Malahide, Dublin
County
Dublin

Addresses on the notices

  • first, second and third floor level
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

The construction of an apartment building comprising 10 units (4 storey) per the granted development under Reg Ref: F22A/0644. The building is comprised of 9 no. 2 bedroom apartments and 1 no. 3 bedroom apartment. Total proposed construction approximately 1139m2. Balconies are included at first, second and third floor level. The development includes all landscaping, plant, boundary treatment, site development works and site services above and below ground.

Work stated for this notice 10 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,139 m².

Planning reference F22A/0644

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.