Commencement notice group
Housing commencement notices — Cabinteely
Cabinteely, Dublin
4 unique commencement events · latest notified commencement 04 Dec 2025 · planning reference supplied
- Unique commencement events
- 4
- Latest notified commencement
- 04 Dec 2025
- Latest notice
- 772 m²
- Planning references supplied
- DZ23A/0028
- Public location
- Cabinteely, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Cabinteely, Dublin
- County
- Dublin
Notice location variants
- Dublin, Dublin
- ground floor and duplex units at first and second floor, located in Cherrywood, Co
- ground, first, second and third levels
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Cherrywood T13 (CN4), Cherrywood, Dublin 18 - It is proposed to construct a new 3 storey creche building (Shell and core only), located in cherrywood, Co. Dublin
Floor area stated for this source: 772 m².
Cherrywood T13 (CN2), Cherrywood Village, Cherrywood, Dublin 18 - It is proposed to construct a new 3 storey residential building consisting of apartments at ground floor and duplex units at first and second floor, located in Cherrywood, Co. Dublin.
Floor area stated for this source: 1,461 m².
Cherrywood T13 (CN3), Cherrywood Village, Cherrywood, Dublin 18 - It is proposed to construct a new 3 storey residential building consisting of apartments at ground floor and duplex units at first and second floor, located in Cherrywood, Co. Dublin.
Floor area stated for this source: 1,254 m².
Cherrywood T13 (CN1), Cherrywood Village, Cherrywood, Dublin 18 - The apartment building consists of residential accommodation at ground, first, second and third levels. The ground level contains ancillary areas including Elec Meters, Sprinkler Tank Room, Refuse Store, Maintenance Store and a Bulky Storage.
Floor area stated for this source: 2,432 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.