Site start
Housing site start — Spiddal
Spiddal, Galway
1 commencement notice · start date 20 Nov 2014 · planning references given
Planning 091027.111051.14384
- Commencement notices
- 1
- Latest start date
- 20 Nov 2014
- Latest notice
- 1 house
- Planning references
- 091027 · 111051
- Location
- Spiddal, Galway
Location
Where the site is
- Area
- Spiddal, Galway
- County
- Galway
Addresses on the notices
- the time, this would not be entirely unusual prior to building regulation
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
PLANNING APPLICATION (PL Ref: 09/1027,for the COMPLETION of a two storey dwelling house, domestic garage, waste water treatment system and percolation area together with all ancillary works(gross floor space 367sqm). PL Ref: 11/1051, Application for permission for change of dwelling & garage designed from that Granted, Planning Ref: 09/1027; PL Ref: 14/384 Extension of Duration.) This project was put on hold in December 2013 due to funding. The Commencement Notice for this application was not lodged with the council due to a oversight on behalf of the client at the time, this would not be entirely unusual prior to building regulation. Padraic Hession and Associates have been employed by the owner to complete a commencement notice under the new building control regulation before any further construction takes place. In the previous construction stage of the dwelling the Foundation, Walls and roof have already completed. Padraic Hession and Associates have carried out and on site inspection to record all works completed and the attached photographs have demonstrate this. The following images log the current stage of construction and serve as a starting point for the new commencement notice.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.