Site start

Housing site start — Sixmilebridge

Sixmilebridge, Clare

1 commencement notice · start date 24 Jun 2019 · planning reference given

Planning P15-935

Commencement notices
1
Latest start date
24 Jun 2019
Latest notice
265 m²
Planning reference
P15-935
Location
Sixmilebridge, Clare

Location

Where the site is

Area
Sixmilebridge, Clare
County
Clare

Addresses on the notices

  • Cloghlea, Bunratty, Sixmilebridge
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of two storey dwelling House, entrance, wastewater treatment system & associated site works at Cloghlea, Bunratty, Sixmilebridge

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 265 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference P15-935 Developer stated: Slattery Construction AND Environmental LTD

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.