Site start
Cork Street, Dublin 8
Dublin 8, Dublin
1 commencement notice · start date 04 Feb 2022 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 04 Feb 2022
- Latest notice
- 870 m²
- Planning references
- None given
- Location
- Cork Street, Dublin 8
Location
Where the site is
- Area
- Dublin 8, Dublin
- County
- Dublin
Addresses on the notices
- Cork Street, Dublin 8
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Material alterations at St Patrick’s Ward at first floor within The Coombe Women’s Hospital, Cork St, Merchants Quay, Dublin 8. The works include Staff central base to be relocated, Material alterations to bed wards and provision of en-suites, Nursery room omitted, Provision of two additional 1-bed rooms and material alterations to existing single rooms, Material alterations to sluices and store rooms, Provision of Optional Second Accessible Room (3-bed ward).
Floor area stated for this source: 870 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.