Site start

Building extension site start — Two Mile House

Two Mile House, Naas, Kildare

1 commencement notice · start date 16 Oct 2019 · planning reference given

Planning 18/1531 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
16 Oct 2019
Latest notice
Scale not stated
Planning reference
18/1531
Location
Two Mile House, Naas, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Two Mile House, Naas, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 18/1531. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The development will consist of the construction of an extension to the rear of the family room complete with dormer bedroom over, the squaring off of the angled walls of the existing sunroom and the construction of an extension to the rear of this existing sunroom, the removal of the bay windows to the front elevation and replacement with new elongated windows, alterations to the existing front door and entrance area with new roof over, the removal of the hipped sections to the roofs and replacement with gable ends complete with two additional dormer windows to the front elevation, minor alterations to the existing dormers, provision of new rooflights to the rear roof, replacement of all windows and external doors, internal and external elevational alterations and associated site works all to the existing detached dormer dwelling.

Work stated for this notice Scale not stated for this notice.
Planning reference 18/1531

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.