Site start
Building extension site start — Two Mile House
Two Mile House, Naas, Kildare
1 commencement notice · start date 16 Oct 2019 · planning reference given
Planning 18/1531 · Council file · external
- Commencement notices
- 1
- Latest start date
- 16 Oct 2019
- Latest notice
- Scale not stated
- Planning reference
- 18/1531
- Location
- Two Mile House, Naas, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 18/1531 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Two Mile House, Naas, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 18/1531. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the construction of an extension to the rear of the family room complete with dormer bedroom over, the squaring off of the angled walls of the existing sunroom and the construction of an extension to the rear of this existing sunroom, the removal of the bay windows to the front elevation and replacement with new elongated windows, alterations to the existing front door and entrance area with new roof over, the removal of the hipped sections to the roofs and replacement with gable ends complete with two additional dormer windows to the front elevation, minor alterations to the existing dormers, provision of new rooflights to the rear roof, replacement of all windows and external doors, internal and external elevational alterations and associated site works all to the existing detached dormer dwelling.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.