Commencement notice group

Housing commencement notices — Naas

Naas, Kildare

2 unique commencement events · latest notified commencement 28 May 2021 · planning reference supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
28 May 2021
Latest notice
9 m²
Planning references supplied
20/527
Public location
Naas, Kildare

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Naas, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 20/527. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0076455KE BCMS owner-supplied export

(c) the change of use of part of the ground floor of the existing detached two storey apartment building to the rear of the site from medical services office to an apartment and the construction of a single storey extension to the side of this proposed apartment

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 9 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Builder stated: JD Ravensdale Construction T/a Raven Construction Developer stated: JD Ravensdale Construction T/a Raven Construction
CN0076454KE BCMS owner-supplied export

(a) the demolition of the existing porch to the rear of the existing main house, (b) the construction of a single storey extension to the rear of the existing main house with minor internal and external elevational alterations (d)alterations to the secondary entrance on the northern side of the site to improve sightlines

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 14 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 20/527 Builder stated: JD Ravensdale Construction T/a Raven Construction Developer stated: JD Ravensdale Construction T/a Raven Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.