Site start

Housing site start — Omeath

Omeath, Louth

1 commencement notice · start date 30 Nov 2025 · planning reference given

Planning 2460822 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
30 Nov 2025
Latest notice
5 units
Planning reference
2460822
Location
Omeath, Louth

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Omeath, Louth
County
Louth
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Louth County Council planning record Application details, status and decision record for 2460822. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Demolition of 2 no. existing commercial units (café / retail / storage use) and construction of a three storey mixed commercial & residential building. The lower ground floor comprises of a two bed room apartment and bike & storage area, the ground floor includes 2no. ground floor retail units, with 1no. two bed apartment and 1no. one bed apartment and the first floor comprises of 1no. one bed and 1no. two bed apartments (5no. apartments and 2no. retail units in total) on a site of 0.1318 hectares. All residential units to be provided with private amenity space in the form of balconies. The development includes the provision of new vehicular entrance area, car and bike parking areas, bin storage, EV charging points, revised boundary treatments, new footpaths and stepped access, foul and surface water drainage, watermains, alterations to the existing site levels, retaining walls, all associated / ancillary landscaping and site development works

Work stated for this notice 5 units Explicit phase quantity stated by the source.

Floor area stated for this source: 631 m².

Planning reference 2460822

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.