Commencement notice group
Housing commencement notices — Blackhall
Blackhall, Meath
2 unique commencement events · latest notified commencement 16 Feb 2026 · planning references supplied
- Unique commencement events
- 2
- Latest notified commencement
- 16 Feb 2026
- Latest notice
- 46 m²
- Planning references supplied
- 25/60322 · 2560322
- Public location
- Blackhall, Meath
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 2560322 Meath County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Blackhall, Meath
- County
- Meath
- Notice source points are up to 509 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.435230, -6.594200 Open point
- Public notice source · 53.435552, -6.601861 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Meath County Council planning record Application details, status and decision record for 25/60322. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed new detached single storey pitched roof double garage to the rear side of the existing dwelling.
Floor area stated for this source: 46 m².
1) The demolition of the existing single storey flat roof extensions attached to the rear of the detached dwelling. 2) Proposed new single storey pitched roof extensions to the side and rear to include proposed covered terrace area. 3) Replacement of existing front door with new window to include replacement of all existing windows and existing concrete tiles with slates. 5) Widening of the existing vehicular entrance set back forming new pillars and wing wall with automated sliding gate. 6) Decommissioning /removing of an existing septic tank system and installing a replacement proprietary treatment system and polishing filter in lieu and all associated ancillary site service works
Floor area stated for this source: 215 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.