Commencement notice group
Commencement notices — Newbliss
Newbliss, Monaghan
1 unique commencement event · latest notified commencement 29 Jun 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 29 Jun 2023
- Latest notice
- 247 m²
- Planning references supplied
- 20/8007
- Public location
- Newbliss, Monaghan
Public source geography
Site location
- Public site / locality
- Newbliss, Monaghan
- County
- Monaghan
Public site labels seen across the notices
- rear of building to include disabled parking, replace all existing windows including opening up of 7 no
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Monaghan County Council planning record Application details, status and decision record for 20/8007. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Renovate and restore the former Council Offices which is a Protected Structure, for use as Enterprise and Digital Hub and to include the following works: demolish shed (constructed circa 1970s) to the rear of original structure including asbestos remediation if required, convert original shed to studio/meeting room, convert internal rooms to offices, toilets and a canteen facility, reform and widen the existing entrance from public road to rear courtyard with the replacement of roller doors with hardwood gates, provision of parking at rear of building to include disabled parking, replace all existing windows including opening up of 7 no. windows on the North façade of the building, installation of windows to roof on the North and West facades of the building, replace existing roof structure including chimneys, replace dash to external façade with lime render, replacement of original steps to front of building and inclusion of disabled ramped access, removal of diesel pumps and storage equipment to rear of building and decontamination of site if necessary, all other ancillary site works.
Floor area stated for this source: 247 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.