Housing site start — Kilcormac
Kilcormac, Offaly
2 commencement notices · latest start date 30 Sep 2022 · planning references given
Planning 21/725 · Council file · external
- Commencement notices
- 2
- Latest start date
- 30 Sep 2022
- Latest notice
- 176 m²
- Planning references
- 21/725 · 21725
- Location
- Kilcormac, Offaly
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 21/725 Offaly County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Kilcormac, Offaly
- County
- Offaly
Addresses on the notices
- Daingean, Offaly
- Notice source points are up to 34.1 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.298585, -7.257384 Open point
- Public notice source · 53.176412, -7.726981 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Offaly County Council planning record Application details, status and decision record for 21/725. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE, (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM, (D) VEHICULAR ENTRANCE, (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
Floor area stated for this source: 176 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
THE CHANGE OF USE OF AN EXISTING DWELLING AND PUBLIC HOUSE TO PROVIDE FOR 2 NO. TWO BEDROOM TOWNHOUSES, MODIFICATIONS TO FRONT AND REAR FACADES, INDIVIDUAL PRIVATE OPEN SPACE, REAR GATED ACCESS, AND ALL ASSOCIATED INTERNAL MODIFICATIONS AND SITE WORKS
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.