Site start

Commercial site start — Ballymount Industrial Estate

Ballymount Industrial Estate, Dublin 12, Dublin

5 commencement notices · latest start date 23 Mar 2026 · planning reference given

Planning SD22A/0099 · Planning application · Council file · external

View full project timeline

Commencement notices
5
Latest start date
23 Mar 2026
Latest notice
25 m²
Planning reference
SD22A/0099
Location
Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
2
Completion certificates
2
  1. Completion certificate recorded — source scope not stated South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-02 1 units stated for this certificate · One certificate representation
  2. Completion certificate recorded — source scope not stated South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-06 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Ballymount Industrial Estate, Dublin 12, Dublin
County
Dublin

Addresses on the notices

  • Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
  • Calmount Road & Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD22A/0099. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Apex Hub Unit 2 ESB Substation, Calmount Road, Ballymount, Dublin 12 comprising the construction of a single-storey, detached ESB Substation with 1 No. adjoining switchroom including associated ancillary works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 25 m².

Planning reference SD22A/0099 Developer stated: Park Developments (Dublin) Ltd
Notice 2 Commencement notice

Apex Hub Unit 1, Calmount Road & Ballymount Avenue, Ballymount Industrial Estate, Dublin 12 comprising the construction of a new warehouse / logistics unit with ancillary office use over two floors & associated site development works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,140 m².

Planning reference SD22A/0099
Notice 3 Commencement notice

Apex Hub Unit 1 ESB Substation, Calmount Road & Ballymount Avenue, Ballymount Industrial Estate, Dublin 12 comprising the construction of a new single-storey ESB substation & switchroom.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 25 m².

Planning reference SD22A/0099
Notice 4 Commencement notice (owner-supplied)

Apex Hub External Infrastructural Works, Calmount Road & Ballymount Avenue, Dublin 12 with new footpaths, shared surfaces, linemarking, cycle track; FW, SW drains & watermains; signage, lighting, utilities ducting; hard & soft landscaping.

Work stated for this notice Scale not stated for this notice.
Planning reference SD22A/0099 Developer stated: Park Developments (Dublin) Ltd
Notice 5 Commencement notice (owner-supplied)

Apex Hub Internal Infrastructural works, Calmount Road, Dublin 12 comprising new access roads, concrete footpaths, shared surfaces, cycle track; FW, SW drains & watermains; signage, lighting & utilities ducting; & hard & soft landscaping.

Work stated for this notice Scale not stated for this notice.
Planning reference SD22A/0099 Developer stated: Park Developments (Dublin) Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.