Commencement notice group
Housing commencement notices — Dublin
Dublin 2, Dublin
2 separate notices · latest notified commencement 28 Apr 2021 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 28 Apr 2021
- Latest notice
- 8 units
- Planning references supplied
- 2815/19
- Public location
- Dublin 2, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 2, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin, Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of the existing two-storey rear extension and the conversion of this three-storey over-basement end- of-terrace residential building into an apartment development including a proposed two storey extension to the rear total of 8 no. apartments. Internal and external modifications to the existing structure to facilitate this development and restoration/repair works to existing brickwork, roof, windows and doors. Planning permission is also sought for landscaping; boundary treatment works including low wall and railings with gated entrance and all associated site and engineering works necessary to facilitate the development.
8 units · 2,800 m² · stated on this notice
Clearing of Site, Demolition Works, Building Stabilizatio n,Hoarding and all associated works.
367 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.