Site start
Housing site start — Dublin
Dublin 7, Dublin
1 commencement notice · start date 15 Sep 2026 · planning references given
Planning ABP-320953-24, 4790/23 · Council file · external
- Commencement notices
- 1
- Latest start date
- 15 Sep 2026
- Latest notice
- 90 units
- Planning references
- 4790/23 · ABP-320953-24
- Location
- Dublin 7, Dublin
Location
Where the site is
- Area
- Dublin 7, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-320953-24. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Material Change of Use to Ground Floor Assembly & Recreation and First to Fourth Floor Levels Residential of the Existing Protected Structure Hendron’s Building at No’s 36 40 Dominick Street Upper, Dublin 7 and associated Extension consisting of Residential and Ancillary Use at Ground to Fourth/Sixth Floor Levels.
Floor area stated for this source: 9,959 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.