Commencement notice group
Commencement notices — Dublin
Dublin, Dublin
7 unique commencement events · latest notified commencement 27 Nov 2017 · planning reference supplied
- Unique commencement events
- 7
- Latest notified commencement
- 27 Nov 2017
- Latest notice
- Scale not stated
- Planning references supplied
- SD17A/0177
- Public location
- Dublin, Dublin
Major-project dossier · Wave 2 · W2-098 · Batch 5
Reviewed planning, commencement and document evidence
Exact project story for SD17A/0177 under South Dublin County Council, retaining 7 separate commencement identities.
Source-backed scopeCommencement notices — Dublin
Planning permission scale, commencement-event scale and official document titles remain separate; no notice totals are summed.
- Commencement identities
- 7 retained separately
- Latest group date
- 2017-11-27 not assigned across events
- Maximum on one notice
- Not stated never summed
- Reviewed index
- 0 0 exact document links
- Permitted scale
- 2850 m² permission record; not summed with notices
Planning and appeal references
- Planning_Application SD17A/0177 Open exact official record
Supplier screening cues
- Residential or built-area scale screening cuePermitted scale record states 2,850 m² floor area.
Every retained commencement event
- 2017-11-27 SN0002685SD Open official commencement source
- 2017-11-27 SN0002687SD Open official commencement source
- 2017-11-27 SN0002688SD Open official commencement source
- 2017-11-27 SN0002689SD Open official commencement source
- 2017-11-27 SN0002690SD Open official commencement source
- 2017-11-27 SN0002692SD Open official commencement source
- 2017-11-27 SN0002693SD Open official commencement source
Exact organisation roles
- South Dublin County CouncilPlanningauthority · Exact official planning record SD17A/0177.
Explicit facts with official citations
Each statement keeps its exact reference, official title or drawing-title locator, and review state.
- Planningoutcome Planning outcome recorded as GRANT PERMISSION. SD17A/0177 · Official planning record — SD17A/0177 · Decision field · exactauthorityreferencerecord Open official evidence
- Permittedscale Permitted scale record states 2,850 m² floor area. SD17A/0177 · Official planning record — SD17A/0177 · Residential units and floor-area fields · exactauthorityreferencerecord Open official evidence
Source limitations and event boundary
Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.
- No drawing, report or decision title was available through the approved collector for this exact authority/reference pair.
- Organisation roles are limited to the exact planning authority and, where present, the appeal authority; no project-team or supplier role is inferred.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD17A/0177. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Workshop container as part of the following works: (1) Temporary gas powered generation plant within a 2,850 sq.m. fenced yard containing 12 gas generator units and 2 back-up diesel generator units with associated flues (each 18 m. high), attenuation screen (15 m. high) and auxiliary installations; (2) Gas meter and incoming gas stream reduction plant within a separate 40 sq.m. fenced yard; and (3) Sundry ancillary works.
Control Room container as part of the following works: (1) Temporary gas powered generation plant within a 2,850 sq.m. fenced yard containing 12 gas generator units and 2 back-up diesel generator units with associated flues (each 18 m. high), attenuation screen (15 m. high) and auxiliary installations; (2) Gas meter and incoming gas stream reduction plant within a separate 40 sq.m. fenced yard; and (3) Sundry ancillary works.
Spinop container as part of the following works: (1) Temporary gas powered generation plant within a 2,850 sq.m. fenced yard containing 12 gas generator units and 2 back-up diesel generator units with associated flues (each 18 m. high), attenuation screen (15 m. high) and auxiliary installations; (2) Gas meter and incoming gas stream reduction plant within a separate 40 sq.m. fenced yard; and (3) Sundry ancillary works.
Drum container as part of the following works: (1) Temporary gas powered generation plant within a 2,850 sq.m. fenced yard containing 12 gas generator units and 2 back-up diesel generator units with associated flues (each 18 m. high), attenuation screen (15 m. high) and auxiliary installations; (2) Gas meter and incoming gas stream reduction plant within a separate 40 sq.m. fenced yard; and (3) Sundry ancillary works.
Toilets container as part of the following works: (1) Temporary gas powered generation plant within a 2,850 sq.m. fenced yard containing 12 gas generator units and 2 back-up diesel generator units with associated flues (each 18 m. high), attenuation screen (15 m. high) and auxiliary installations; (2) Gas meter and incoming gas stream reduction plant within a separate 40 sq.m. fenced yard; and (3) Sundry ancillary works.
Safety Spare container as part of the following works: (1) Temporary gas powered generation plant within a 2,850 sq.m. fenced yard containing 12 gas generator units and 2 back-up diesel generator units with associated flues (each 18 m. high), attenuation screen (15 m. high) and auxiliary installations; (2) Gas meter and incoming gas stream reduction plant within a separate 40 sq.m. fenced yard; and (3) Sundry ancillary works.
Kitchen container as part of the following works: (1) Temporary gas powered generation plant within a 2,850 sq.m. fenced yard containing 12 gas generator units and 2 back-up diesel generator units with associated flues (each 18 m. high), attenuation screen (15 m. high) and auxiliary installations; (2) Gas meter and incoming gas stream reduction plant within a separate 40 sq.m. fenced yard; and (3) Sundry ancillary works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.