Site start

Housing site start — Newmarket-on-Fergus

Newmarket-on-Fergus, Clare

2 commencement notices · latest start date 27 May 2026 · planning reference given

Planning 2626 · Planning application · Council file · external

View full project timeline

Commencement notices
2
Latest start date
27 May 2026
Latest notice
1 house
Planning reference
2626
Location
Newmarket-on-Fergus, Clare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
2
Completion certificates
0

Planning 2626 — CONDITIONAL · Decision 2026-03-27 · Final grant 2026-04-29

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Newmarket-on-Fergus, Clare
County
Clare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official drawings and scanned-file sources are available below.

Public application drawings are available for this notice group.

Use the official drawings or scanned files to review the submitted plans and elevations.

  • Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 2626. Clare County Council Official link · last checked 02 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official scanned files · external
  • Site Layout Site layout plan Exact official document for 2626. Clare County Council Official link · last checked 02 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official site layout · external
  • Architecture Drawings Site location map Exact official document for 2626. Clare County Council Official link · last checked 02 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings Floor Plans Exact official document for 2626. Clare County Council Official link · last checked 02 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings Plans, Sections, Elevations Exact official document for 2626. Clare County Council Official link · last checked 02 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings Environment Section Exact official document for 2626. Clare County Council Official link · last checked 02 Aug 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Official planning file Clare County Council planning record Application details, status and decision record for 2626. Clare County Council Official link · last checked 02 Aug 2026 Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

To construct a dwelling house, with effluent treatment system, new entrance from public road, and all associated site works

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 222 m².

Notice 2 Commencement notice (owner-supplied)

To construct a detached garage and all associated site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 39 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.