Stepaside, Dublin
2 commencement notices · latest start date 05 Feb 2019 · planning reference given
Planning D18A/0243 · Planning application
- Commencement notices
- 2
- Latest start date
- 05 Feb 2019
- Latest notice
- Scale not stated
- Planning reference
- D18A/0243
- Location
- Stepaside, Dublin
Location
Where the site is
- Area
- Stepaside, Dublin
- County
- Dublin
Addresses on the notices
- Dublin
- Notice source points are up to 4.7 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.304428, -6.212251 Open point
- Public notice source · 53.262454, -6.219344 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: an extension and additional spaces to the previous approved carpark. The extension of the carpark to the north/east of the site, with the additional parking to the north/west and south/west of the site; and all associated site works.
A. Single storey flat roof extension to side and rear of existing building. B. Internal modifications and associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.