Site start
Housing site start — Bray
Bray, Wicklow
1 commencement notice · start date 15 Apr 2019 · planning reference given
Planning 18654 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 15 Apr 2019
- Latest notice
- 99 m²
- Planning reference
- 18654
- Location
- Bray, Wicklow
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 18654 Wicklow County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Bray, Wicklow
- County
- Wicklow
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wicklow County Council planning record Application details, status and decision record for 18654. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) the demolition of the 10.33 m2 existing conservatory, to the rear of the existing 66.75 m2 dwelling, (2) a new 22.26 m2 replacement extension to the rear of the existing dwelling incorporating 2 No. Roof windows, (3) a new roof window to the existing rear (western) roof, (4) a new window to the existing side (southern) elevation, (5) a new entrance door & and glazed panels to the existing side (southern) elevation, and (6) all associated site works
Floor area stated for this source: 99 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.