Site start

Housing site start — Walkinstown

Walkinstown, Dublin

1 commencement notice · start date 20 Mar 2026 · planning reference given

Planning 3324/25 · Planning application

View full project timeline

Commencement notices
1
Latest start date
20 Mar 2026
Latest notice
270 m²
Planning reference
3324/25
Location
Walkinstown, Dublin

Location

Where the site is

Area
Walkinstown, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Demolition of of existing two number single storey detached garages , demolition of the existing house . Construction of larger single storey detached house on larger footprint . This larger house has living area , 4 bedroom and therapy room . The house constructed to suit a child with reduced mobility and special requirements .

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 270 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 3324/25

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.