Site start
Housing site start — Raheny
Raheny, Dublin
1 commencement notice · start date 28 Apr 2026 · planning reference given
Planning 3118/24 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 Apr 2026
- Latest notice
- 10,580 m²
- Planning reference
- 3118/24
- Location
- Raheny, Dublin
Reviewed planning, commencement and document evidence
- Commencement identities
- 1 retained separately
- Latest group date
- 28 Apr 2026 not assigned across events
- Maximum on one notice
- 102 units never summed
- Reviewed index
- 8 8 exact document links
Planning and appeal references
- Planning 3118/24 Open exact official record
Every retained commencement event
- 28 Apr 2026 Commencement notice 102 units on this event · 10580 m² on this event Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Dublin City CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
Official document index highlights
Reviewed public index extract; this is not asserted to be the complete authority file.
- Architecture drawings Ground Floor Plan L00 Open exact official document
- Architecture drawings First Floor Plan Open exact official document
- Site layout Proposed Site Plan Open exact official document
- Site layout Existing Responsibility Boundaries Open exact official document
- Engineering and drainage Drainage and Watermain Report Open exact official document
- Engineering and drainage Existing Site Services Open exact official document
- Landscape plans Arborist Tree Survey Information Open exact official document
- Landscape plans Tree Survey Open exact official document
Location
Where the site is
- Area
- Raheny, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official drawings and scanned-file sources are available below.
Verified official drawing destinations are available for this planning reference.
Use the official drawings or scanned files to review the submitted plans and elevations.
-
Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 3118/24. Official planning source Official link · last checked 29 Jul 2026 Exact official destination confirmed for this planning reference.Open official scanned files · external
-
Site Layout Proposed Site Plan Dublin City Council — reference 3118/24 Dublin City Council Official link · last checked 29 Jul 2026 Reviewed direct official Dublin City file selected from the exact site layout category.Open official site layout · external
-
Architecture Drawings Ground Floor Plan L00 Dublin City Council — reference 3118/24 Dublin City Council Official link · last checked 29 Jul 2026 Reviewed direct official Dublin City file selected from the exact architecture drawings category.Open official architecture drawing · external
-
Engineering Drawings Drainage and Watermain Report Dublin City Council — reference 3118/24 Dublin City Council Official link · last checked 29 Jul 2026 Reviewed direct official Dublin City file selected from the exact engineering and drainage category.Open official engineering drawing · external
-
Landscape Drawings Arborist Tree Survey Information Dublin City Council — reference 3118/24 Dublin City Council Official link · last checked 29 Jul 2026 Reviewed direct official Dublin City file selected from the exact landscape plans category.View official drawings · external
-
Official planning file Dublin City Council planning record Application details, status and decision record for 3118/24. Official planning source Official link · last checked 29 Jul 2026 Exact official destination confirmed for this planning reference.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed development includes the demolition of five two-storey apartment blocks (61 bedsits) and the construction of 102 one-bedroom apartments for older persons (96 Universal Design and 6 Universal Design Plus) within a four-storey perimeter block, incorporating a communal room and secure landscaped courtyard. The scheme also provides public and private open spaces, ancillary structures, site infrastructure works, landscaping, lighting, revised access and boundaries, and a new ESB substation.
Floor area stated for this source: 10,580 m².
Source unit value with scope not stated: 102 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.