Commencement notice group
Commercial commencement notices — Dublin
Dublin 1, Dublin
1 unique commencement event · latest notified commencement 27 Mar 2020 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 27 Mar 2020
- Latest notice
- 2 units
- Planning references supplied
- ABP-305733-19
- Public location
- Dublin 1, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 1, Dublin
- County
- Dublin
Notice location variants
- 1st FL level & a 1 bedroom apt at 2nd floor level with roofing works and a roof terrace SN0005233DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-305733-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change the use of a 3 storey building known as Unit 3, Parnell Court, Granby Row, Dublin 1, previously in office/educational use to accommodate a 1 bedroom apt at 1st FL level & a 1 bedroom apt at 2nd floor level with roofing works and a roof terrace. No change at ground floor level.R
Floor area stated for this source: 186 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.