Site start
Housing site start — Carrigrohane
Carrigrohane, Cork
1 commencement notice · start date 21 Feb 2020 · planning reference given
Planning 1904942
- Commencement notices
- 1
- Latest start date
- 21 Feb 2020
- Latest notice
- Scale not stated
- Planning reference
- 1904942
- Location
- Carrigrohane, Cork
Location
Where the site is
- Area
- Carrigrohane, Cork
- County
- Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Works comprising of the following; a) the demolition of an existing single storey garage to side of existing dwelling. Permission is also sought for alterations and extension to the existing dwelling for the following; b) the construction of new two story extension to the side of the existing dwelling, c) elevational alterations to the existing dwelling, d) a bay window extension to front, e) alterations to the existing site entrance & boundary walls, f) relocation of driveway route through the site
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.