Site start
Housing site start — Dundrum
Dundrum, Dublin
1 commencement notice · start date 02 May 2023 · planning reference given
Planning D22A/0913 · Planning application
- Commencement notices
- 1
- Latest start date
- 02 May 2023
- Latest notice
- Scale not stated
- Planning reference
- D22A/0913
- Location
- Dundrum, Dublin
Location
Where the site is
- Area
- Dundrum, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Rear single storey extension at ground floor, a two-storey extension to the side and front with a new pitched & gabled roof, a flat roof dormer to the rear at attic level, alterations to the front porch and external insulation to the front, side and rear alterations of existing dwelling. And all associated site works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.