Commencement notice group

Housing commencement notices — Drumlion

Drumlion, Roscommon

1 separate notice · latest notified commencement 03 Jun 2025 · planning reference supplied

Source notices
1
Latest notified commencement
03 Jun 2025
Latest notice
1 home
Planning references supplied
2460086
Public location
Drumlion, Roscommon

Public source geography

Site location

Public site / locality
Drumlion, Roscommon
County
Roscommon
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Roscommon County Council · reference 2460086 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference2460086

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0129400RN BCMS owner-supplied export

To construct a new one storey block built dwelling house AND C/W Wastewater Treatment System to EPA CoP 2021 EN 12566-3 standards and all other site works as required

1 home · 288 m² · stated on this notice

Planning reference 2460086

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.