Site start
Housing site start — Letterkenny
Letterkenny, Donegal
1 commencement notice · start date 04 Jan 2016 · planning reference given
Planning 1550674 · Council file · external
- Commencement notices
- 1
- Latest start date
- 04 Jan 2016
- Latest notice
- 1 house
- Planning reference
- 1550674
- Location
- Letterkenny, Donegal
Location
Where the site is
- Area
- Letterkenny, Donegal
- County
- Donegal
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The project proposed scope of work consists of: the demolition of an existing single storey dwelling with integrated garage, together with the removal of all associated foundations, foul and surface water drainage and existing septic tank and percolation area. The removal of all existing hard standing, tarmac drive and hardstanding including front gate posts and timber gates: removing all material off site. The erection and completion of a detached two storey house together with new foul and surface water drainage, new proprietary sewerage treatment plant and sand polishing filter, relocated site entrance and driveway with all services and external works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.