Site start
Housing site start — Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 29 Aug 2014 · planning reference given
Planning 2658/14
- Commencement notices
- 1
- Latest start date
- 29 Aug 2014
- Latest notice
- Scale not stated
- Planning reference
- 2658/14
- Location
- Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
Addresses on the notices
- ground level to the south- west of the site
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Saint Brigids School, Haddington Place, Ballsbridge, Dublin 4. The development will consist of (a) the construction of 2 no. single storey temporary accommodation building units to house 4 no. classrooms and associated toilets (total area c.300sqm), all to serve St. Brigid's Primary School adjacent; (b) a c.260sqm external play area at ground level to the south- west of the site; (c) a new site boundary onto Haddington Place comprising metal railings, to replace existing railings, to an overall height of c.2.2m, and with access gates; (d) removal of a c.7m length of existing boundary between the development site and the adjacent St. Brigids's Primary School to the west, to connect the new development with the existing school; (e) foul and surface water connections at Haddington Places and all associated ancillary site development and landscaping works.
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.