Site start

Housing site start — Sutton

Sutton, Dublin

1 commencement notice · start date 06 Aug 2025 · planning reference given

Planning F22B/0096 · Planning application

View full project timeline

Commencement notices
1
Latest start date
06 Aug 2025
Latest notice
Scale not stated
Planning reference
F22B/0096
Location
Sutton, Dublin

Location

Where the site is

Area
Sutton, Dublin
County
Dublin

Addresses on the notices

  • first floor level at the rear of the dwelling, an extension of approx
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Dormer window at first floor level at the rear of the dwelling, an extension of approx. 2sq m in floor area at the dormer in the bedroom, and ancillary works

Work stated for this notice Scale not stated for this notice.
Planning reference F22B/0096 Developer stated: Collen Construction Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.