Site start
Housing site start — Dublin
Dublin 4, Dublin
1 commencement notice · start date 16 Jun 2020 · planning reference given
Planning 3713/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 16 Jun 2020
- Latest notice
- Scale not stated
- Planning reference
- 3713/19
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
PROTECTED STRUCTURE: The development will consist of the demolition of the ground floor rear extension and ground floor of the return and the construction of a new single storey rear extension, a new window and Velux to the return and with internal alterations to the ground and first floor, to the existing two storey terraced house with associated landscaping. The existing house is a protected structure.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.