Site start

Housing site start — Galway

Galway, Galway

1 commencement notice · start date 10 Apr 2023 · planning reference given

Planning 22/203 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
10 Apr 2023
Latest notice
349 m²
Planning reference
22/203
Location
Galway, Galway

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate recorded — source scope not stated Galway City Council · commencement notice Completion certificate · First observed in the official monthly source 2023-04 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Galway, Galway
County
Galway
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Galway City Council planning record Application details, status and decision record for 22/203. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Internal alterations to the existing public house including changes to the existing front doors, relocation of an internal stairs at ground and basement levels, and fire safety upgrade works to the existing ceilings and walls at ground and basement levels including ancillary and associated services

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 349 m².

Planning reference 22/203 Developer stated: Titleridge Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.