Site start

Housing site start — Killimer

Killimer, Clare

4 commencement notices · latest start date 15 Apr 2026 · planning reference given

Planning ABP-319080-24

Commencement notices
4
Latest start date
15 Apr 2026
Latest notice
38 m²
Planning reference
ABP-319080-24
Location
Killimer, Clare

Location

Where the site is

Area
Killimer, Clare
County
Clare

Addresses on the notices

  • Moneypoint Power Station, Carrowdotia, Killimer, Co
  • Clare
Location evidence needs care
  • Notice source points are up to 178.8 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 52.608550, -9.426821 Open point
  • Public notice source · 52.608550, -9.426821 Open point
  • Public notice source · 52.608550, -9.426821 Open point
  • Public notice source · 53.581276, -7.293497 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-319080-24. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Proposed HFO Bund B Electrical Supply Container - single storey prefabricated container housing a singular transformer and associated control panels.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 38 m².

Appeal reference ABP-319080-24
Notice 2 Seven-day notice

Proposed HFO Bund A Electrical Supply Container - Sngle storey prefabricated container housing a singular transformer and all associated control panels at Moneypoint Power Station, Carrowdotia, Killimer, Co. Clare

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 38 m².

Appeal reference ABP-319080-24
Notice 3 Seven-day notice

Construction of new LV E-House supplying power to the proposed auxiliary boiler building. The E-House will contain two power transformers. The building is a single storey construction, constructed from a steel frame and fire rated cladding.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 51 m².

Appeal reference ABP-319080-24
Notice 4 Seven-day notice

Construction of a new boiler house (24m long x 18m wide x 11m high) to house auxiliary boilers (2 no. electric and 1 no. distillate), including an external blowdown vessel and bund, a 30m high exhaust stack and all ancillary site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 435 m².

Appeal reference ABP-319080-24

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.