Site start
Housing site start — Dublin
Dublin 14, Dublin
1 commencement notice · start date 22 Mar 2019 · planning reference given
Planning D18A/0742 · Planning application
- Commencement notices
- 1
- Latest start date
- 22 Mar 2019
- Latest notice
- 1 house
- Planning reference
- D18A/0742
- Location
- Dublin 14, Dublin
Location
Where the site is
- Area
- Dublin 14, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: _Alterations to the existing single storey structure and removal of existing chimney to the side. _Construction of new two storey extension to side and front of existing house _Attic conversion and dormer attic extension to rear roofslope with rooflight _Single storey extension to rear of existing dwelling with rooflight and chimney _Front elevational alterations including new bay window,porch and rooflights to front roofslope _Increase of existing vehicular driveway to 3.5M in width _All associated alterations to existing elevations, siteworks, drainage and landscaping works
Floor area stated for this source: 204 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.