Site start
Housing site start — Naas
Naas, Kildare
15 commencement notices · latest start date 15 Jun 2017 · planning reference given
Planning 14843 · Council file · external
- Commencement notices
- 15
- Latest start date
- 15 Jun 2017
- Latest notice
- 1 house
- Planning reference
- 14843
- Location
- Naas, Kildare
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Two Storey semi-detached 3 bedroom dwellinghouse (House Type C) Site 268
Two Storey semi- detached 3 bedroom dwellinghouse (House Type C) Site 267
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Three Storey detached 4 bedroom dwellinghouse (House Type D) Site 275
Two Storey semi- detached 3 bedroom dwellinghouse (House Type B - Dual Aspect) Site 281
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Two Storey semi-detached 3 bedroom dwellinghouse (House Type B - Dual Aspect) Site 280
Two Storey semi- detached 3 bedroom dwellinghouse (House Type A) Site 279
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Two Storey semi-detached 3 bedroom dwellinghouse (House Type A) Site 278
Two Storey semi-detached 3 bedroom dwellinghouse (House Type A) Site 277
Two Storey semi- detached 3 bedroom dwellinghouse (House Type A) Site 276
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Two Storey semi-detached 3 bedroom dwellinghouse (House Type A) Site 274
Two Storey semi-detached 3 bedroom dwellinghouse (House Type A) Site 273
Two Storey semi- detached 3 bedroom dwellinghouse (House Type A) Site 272
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Two Storey semi- detached 3 bedroom dwellinghouse (House Type A) Site 271
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Two Storey semi-detached 3 bedroom dwellinghouse (House Type A) Site 270
Two Storey semi- detached 3 bedroom dwellinghouse (House Type A) Site 269
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.