Site start
Building extension site start — Dublin
Dublin 18, Dublin
2 commencement notices · latest start date 28 Sep 2026 · planning reference given
Planning D16A/0449/E · Planning application · Council file · external
- Commencement notices
- 2
- Latest start date
- 28 Sep 2026
- Latest notice
- Scale not stated
- Planning reference
- D16A/0449/E
- Location
- Dublin 18, Dublin
Location
Where the site is
- Area
- Dublin 18, Dublin
- County
- Dublin
Addresses on the notices
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
New widened vehicular entrance containing new pillars and gates. The decision dated 10th September 2021 included a condition that the duration of permission is extended until 23/12/2026. The works shall therefore be completed by 23rd December 2026. Reason: It is considered that five additional years is a reasonable time for the completion of the permitted development.
Removal of the existing recessed balcony doors and windows and to install new windows into the existing arched ope and to allow the extension of the existing balcony floor area to become the internal floor area within the master bedroom on the first floor.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.