Commencement notice group
Saplings school — commencement notices
Mullingar, Westmeath
1 separate notice · latest notified commencement 10 Dec 2018 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 10 Dec 2018
- Latest notice
- 3,751 m²
- Planning references supplied
- 18/6047
- Public location
- Mullingar, Westmeath
Public source geography
Site location
- Public site / locality
- Mullingar, Westmeath
- County
- Westmeath
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Westmeath County Council · reference 18/6047 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction 2 no. new primary school buildings with a total combined floor area of 3750m2 consisting of Gaelscoil an Choillinn, Mullingar (RN 20238V) a 3-storey 1768m2 8 classroom primary school to the south end of the site including a general purpose hall,and Saplings school Mullingar (RN 20373E) a new 2-Storey 1934m2 6-classroom base special needs school to the north end of the site.
3,751 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.