Commencement notice group

Housing commencement notices — CASTLEBAR

CASTLEBAR, Mayo

1 separate notice · latest notified commencement 17 May 2017 · planning reference supplied

Source notices
1
Latest notified commencement
17 May 2017
Latest notice
2 units
Planning references supplied
16/442
Public location
CASTLEBAR, Mayo

Public source geography

Site location

Public site / locality
CASTLEBAR, Mayo
County
Mayo

No usable public source coordinate is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference16/442

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0027248MO BCMS open-data feed

DEMOLISH EXISTING DERELICT DWELLING HOUSE AND CONNECTING DISUSED SHOP/STORE/OFFICE (223SQM), DEMOLISH EXISTING RETAIL AREA/SHOP/OFFICE/EXTERNAL COVERED STORE (288SQM) DEMOLISH EXISTING MATERIALS SHEDS/COMMERCIAL STORES (411SQM) REMOVE EXISTING STORAGE CONTAINER (30SQM), REMOVE EXISTING OPEN TIMBER STORE CANOPY, CONSTRUCT PROPOSED EXTENSION TO EXISTING AGRI-FEED/COMMERCIAL CEMENT STORE (235SQM) CONSTRUCT PROPOSED MATERIALS SHED /COMMERCIAL STORE (790SQM) CONSTRUCT PROPOSED RETAIL AREA/SHOP TO INCLUDE OFFICE ACCOMMODATION, CANTEEN AND SANITARY FACILIITIES (611SQM) ERECT ROADSIDE TOTEM SIGNAGE, CONSTRUCT PROPOSED CAR PARKING AREA WITH PUBLIC LIGHTING, CONSTRUCT 2M HIGH PROPOSED ROADSIDE BOUNDARY WALL WITH RAILINGS, CARRY OUT PROPOSED BOUNDARY TREATMENT TO ENTIRE SITE TO INCLUDE FENCING AND LANSDCAPING, INSTALL PROPOSED SURFACE WATER SYSTEM TO INCLUDE PETROL INTERCEPTOR WITH FINAL DISCHARGE TO EXISTING OPEN DRAIN, INSTALL AND CONNECT TO PROPRIETARY EFFLUENT TREATMENT SYTEM AND PECOLATION

2 units · stated on this notice

Planning reference 16/442

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.