Commencement notice group
Housing commencement notices — Ballyvoneen
Ballyvoneen, Kildare
3 unique commencement events · latest notified commencement 08 May 2025 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 08 May 2025
- Latest notice
- 894 m²
- Planning references supplied
- 24/61109
- Public location
- Ballyvoneen, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 24/61109 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Ballyvoneen, Kildare
- County
- Kildare
Notice location variants
- Guidenstown, South Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 24/61109. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed development will consist of: D) Construction of staff accommodation in the form of 3 no. single storey terraced units with associated car parking areas, E) Construction of a farm managers house in the form of a part 2 storey, part single storey dwelling with a single storey integrated garag landscaping, boundary treatments, lighting and all ancillary site works at Guidenstown, South Co. Kildare
Floor area stated for this source: 894 m².
Source unit value with scope not stated: 4 houses. It is not presented as notice-specific scale.
The proposed development will consist of: A) Demolishing existing unroofed derelict building (in ruins) with materials to be reused as part of the new development, B) Construction of a new single storey stable block that will cater for 16 stable units C) Construction of a new equine barn with 20 horse stalls and ancillary rooms F) Construction of a single storey isolation stable block, G) Construction of an agricultural shed providing a covered paddock area, H) Construction of a fillies barn, I) Construction of a horse walker and horse lunging ring, J) Construction of a machinery shed and an agricultural shed for hay storage with ancillary manure pit, K) Construction of a horse loading bay and wash bay area, L) Installation of waste water treatment systems to cater for all residential and equine buildings, including the installation of underground tanks, M) Upgrade to existing vehicular entrance, N) Installation of a new well, O) Construction of internal access roads, additional car parking (including EV spaces), landscaping, boundary treatments, lighting and all ancillary site works. Refer to 7 Day Commencement notice for the two storey office unit. The residential units covered under this planning permission is being lodged under a separate commencement notice (ref 8536551)
Floor area stated for this source: 2,784 m².
The proposed development will consist of the construction of the 2 storey element of the main yard building accommodating the staff canteen, offices, viewing area, toilet facilities which form part of the Guidenstown Stud Farm Development. This proportion of the works are subject to a fire certificate and DAC application. The remainder of the development will be commenced under a short form commencement notice.
Floor area stated for this source: 131 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.