Site start

Housing site start — newbridge

newbridge, Kildare

1 commencement notice · start date 20 Sep 2017 · planning reference given

Planning 16799 · Council file · external

Commencement notices
1
Latest start date
20 Sep 2017
Latest notice
Scale not stated
Planning reference
16799
Location
newbridge, Kildare

Location

Where the site is

Area
newbridge, Kildare
County
Kildare

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

1)A first floor side & rear extension of circa 12 sq.m to existing dormer bungalow, 2) Internal alterations to existing dwelling including the use of existing attic space for storage space. 3) Associated alterations to side & rear elevations 4) Foul water to existing on site effluent treatment system and percolation area 5) Surface water to existing soakaways 6) and all associated site works

Work stated for this notice Scale not stated for this notice.
Planning reference 16799

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.