Commencement notice group

Housing commencement notices — Dublin

Dublin 9, Dublin

3 unique commencement events · latest notified commencement 13 Dec 2023 · planning reference supplied

Unique commencement events
3
Latest notified commencement
13 Dec 2023
Latest notice
101 units
Planning references supplied
ABP-308905-20
Public location
Dublin 9, Dublin

Public source geography

Site location

Public site / locality
Dublin 9, Dublin
County
Dublin

Public site labels seen across the notices

  • Millfield View, Glasnevin Hill, Dublin 9
  • Millfield View, Glasnevin Hill, Glasnevin, Dublin 9
  • No
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-308905-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0009539DC BCMS open-data feed

Construction of two number apartment blocks over basement comprising 101no. apartments and 4no. commercial units at Millfield View, Glasnevin Hill, Dublin 9. [Block 1: Apt Nos 01- 32 and 2no. commercial units, Block 2: Apt Nos 33-101 and 2no. commercial units]

Work stated for this notice 101 units Explicit phase quantity stated by the source.

Floor area stated for this source: 8,903 m².

Appeal reference ABP-308905-20
CN0105305DC BCMS owner-supplied export

Installation and testing of Contiguous piles arising from temporary works design to facilitate ground excavation for intended building works at Millfield View, Glasnevin Hill, Glasnevin, Dublin 9.

Work stated for this notice Scale not stated for this notice.
Appeal reference ABP-308905-20 Builder stated: Homeland Projects Ltd Developer stated: Glasnevin Property Ventures Ltd
CN0102248DC BCMS owner-supplied export

Enabling Works including demolition of vacant two storey motor vehicle showroom and vacant house at No.38 Glasnevin Hill, excavation for new basement, site clearance and installation of temporary works.

Work stated for this notice Scale not stated for this notice.
Appeal reference ABP-308905-20 Builder stated: Homeland Projects Ltd Developer stated: Glasnevin Property Ventures Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.