Site start
Development works under this commencement notice will form the first phase of a two-phase
Naas, Kildare
1 commencement notice · start date 11 Dec 2023 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 11 Dec 2023
- Latest notice
- 98 units
- Planning references
- None given
- Location
- Naas, Kildare
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
Addresses on the notices
- the former Devoy Barracks, John Devoy Road, Naas, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Development works under this commencement notice will form the first phase of a two-phase delivery of housing units referred to as Phase 1A and Phase 1B. Phase 1A includes the construction of 98nr. dwelling units consisting of 42nr. terraced houses and 56nr. apartment / duplex apartment units at the former Devoy Barracks, John Devoy Road, Naas, Co. Kildare. All houses are provided within Blocks 1-9 and all duplexes within Blocks E, F, G H and J. The blocks range in height from 2-4 storeys. Ancillary site development works include 3 no. ESB sub-stations, bike stores, bin stores, plant rooms, public lighting & foul and surface water drainage; demolition of an existing single storey structure of c. 10.7sq.m on the eastern boundary of the site; internal roads & footpaths; surface car parking and EV charging; site landscaping including children’s play area, wetlands/SUDs features, and boundary treatments. The full reduced earthworks dig, primary below ground drainage infrastructure, attenuation tanks and ESB Substation for the overall site area, i.e. for both phase 1A and phase 1B, will be completed in Phase 1A.
Floor area stated for this source: 9,560 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.