Site start

Development works under this commencement notice will form the first phase of a two-phase

Naas, Kildare

1 commencement notice · start date 11 Dec 2023 · no planning reference given

Commencement notices
1
Latest start date
11 Dec 2023
Latest notice
98 units
Planning references
None given
Location
Naas, Kildare

Location

Where the site is

Area
Naas, Kildare
County
Kildare

Addresses on the notices

  • the former Devoy Barracks, John Devoy Road, Naas, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

Development works under this commencement notice will form the first phase of a two-phase delivery of housing units referred to as Phase 1A and Phase 1B. Phase 1A includes the construction of 98nr. dwelling units consisting of 42nr. terraced houses and 56nr. apartment / duplex apartment units at the former Devoy Barracks, John Devoy Road, Naas, Co. Kildare. All houses are provided within Blocks 1-9 and all duplexes within Blocks E, F, G H and J. The blocks range in height from 2-4 storeys. Ancillary site development works include 3 no. ESB sub-stations, bike stores, bin stores, plant rooms, public lighting & foul and surface water drainage; demolition of an existing single storey structure of c. 10.7sq.m on the eastern boundary of the site; internal roads & footpaths; surface car parking and EV charging; site landscaping including children’s play area, wetlands/SUDs features, and boundary treatments. The full reduced earthworks dig, primary below ground drainage infrastructure, attenuation tanks and ESB Substation for the overall site area, i.e. for both phase 1A and phase 1B, will be completed in Phase 1A.

Work stated for this notice 98 units Explicit phase quantity stated by the source.

Floor area stated for this source: 9,560 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.