Commencement notice group
Commencement notices — Maynooth
Maynooth, Kildare
2 separate notices · latest notified commencement 19 Nov 2018 · planning basis not stated
- Source notices
- 2
- Latest notified commencement
- 19 Nov 2018
- Latest notice
- 590 m²
- Planning references supplied
- None stated
- Public location
- Maynooth, Kildare
Public source geography
Site location
- Public site / locality
- Maynooth, Kildare
- County
- Kildare
Public site labels seen across the notices
- St Patricks College Maynooth, a Protected Structure
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The proposed development comprises the completion of Phase 2 of the renovation and repair of the existing Kitchen Courtyard buildings at St Patricks College Maynooth, a Protected Structure. Phase 1 works were delayed due to the use of St Patrick’s College as organising centre for the Papal Visit to Ireland in 2018. The Phase 1 works are ongoing and will be completed prior to completion of Phase 2.
590 m² · stated on this notice
The proposed development consists of Phase 1 of the renovation and repair of the existing Kitchen Courtyard buildings at St Patricks College Maynooth, a Protected Structure.
50 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.