Site start
Building extension site start — Dublin
Dublin 4, Dublin
1 commencement notice · start date 26 Nov 2024 · planning reference given
Planning D21A/0179 · Planning application
- Commencement notices
- 1
- Latest start date
- 26 Nov 2024
- Latest notice
- 1,265 m²
- Planning reference
- D21A/0179
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level including construction of a new protected stairwell in the proposed Link E-H serving all floor levels
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
UCD Newman Building (Additional Floors to Block H). Block H currently consists of a single storey building and it is proposed to add 2 no. additional floor levels (first and second floor) and related link corridors to the adjacent Blocks E and K. New access and egress aids will be also provided at ground floor level including construction of a new protected stairwell in the proposed Link E-H serving all floor levels.
Floor area stated for this source: 1,265 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.