Site start
Housing site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 16 Mar 2015 · planning reference given
Planning D14B/0339 · Planning application
- Commencement notices
- 1
- Latest start date
- 16 Mar 2015
- Latest notice
- 1 house
- Planning reference
- D14B/0339
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(a) demolition of single storey porch to front, (b) new 3.90 sqm single storey pitched roof extension to front, (c) new 39.60 sqm two storey pitched roof extension to rear, (d) removal of existing first floor flat roof to rear, (e) new pitched roof to entire house maintaining existing ridge height, (f) alterations to existing window opes to front and rear elevations, including new windows and external doors throughout, (g) blocking up of ground and first floor window opes to side (north-east elevation), (h) removal of 2 no. chimney stacks to rear roof plane, (i) 3 no. new Velux rooflights to front roof plane, (j) 3 no. new Velux rooflights to rear roof plane, (k) internal alterations and (l) all associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.